Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Microsoft is giving away 50,000 FREE Microsoft Certification exam vouchers. Get Fabric certified for FREE! Learn more

Reply
krutikapai
New Member

How do I place data labels for Advanced Gantt Chart on a specific side of bars to make it consistent

Hi Everyone,

 

I am using Advanced Gantt Chart by Definitive Logic on Power BI. 

When a Phase and Milestone gantt chart is created using that view, the data labels are set for some on left and other on right. I want to place all lebels either to left or to right or center. 
Is there a way to do that ?

Currently, in  formatting options I do not find any option for placement data labels after enabling them on Gantt Chart.

 

Attached is the screenshot with dummy data and data labels (highlighted) which are placed by default to left, right and center.Gantt Chart Support Ticket.png

 

 

 

4 REPLIES 4
v-achippa
Community Support
Community Support

Hi @krutikapai,

 

Thank you for reaching out to Microsoft Fabric Community.

 

The Advanced Gantt Chart by definitive logic, the data label placement like left, right or center is automatically handled by the visual depending on space and layout. unfortunately, there is currently no built in setting in the visual’s formatting pane to manually control or fix the label alignment.

 

Since you are already using the Advanced Gantt by Definitive Logic, I request you to please submit a feature request a detailed feedback and ideas through Microsoft's official feedback channels or upvote the existing ones. Feedback submitted through these channels is frequently reviewed by the product teams and can contribute to meaningful improvements.

Fabric Ideas - Microsoft Fabric Community

 

If this post helps, then please consider Accepting as solution to help the other members find it more quickly, don't forget to give a "Kudos" – I’d truly appreciate it! 

 

Thanks and regards,

Anjan Kumar Chippa

Thank you for the feedback.

Like you mentioned, I have submitted a feature request on Microsoft Fabric Community.

Here is the link - https://community.fabric.microsoft.com/t5/Fabric-Ideas/Placement-of-data-labels-on-a-specific-side-i...

 

Thank you.

Akash_Varuna
Resident Rockstar
Resident Rockstar

Hi @krutikapai I don’t think the Gantt chart has a built-in option to align all data labels uniformly. You could try customizing it with a measure to control the label position dynamically or creating a custom chart using Python or R in Power BI for more control.You could also check this in AppSource visuals

Thank you Akash. 
Yes I am going to try creating a measure and see if that works out.

Meantime, I have also submitted a feature request on Microsoft Fabric Community for the data label positioning option.

 

Helpful resources

Announcements
Notebook Gallery Carousel1

NEW! Community Notebooks Gallery

Explore and share Fabric Notebooks to boost Power BI insights in the new community notebooks gallery.

April2025 Carousel

Fabric Community Update - April 2025

Find out what's new and trending in the Fabric community.

"); $(".slidesjs-pagination" ).prependTo(".pagination_sec"); $(".slidesjs-pagination" ).append("
"); $(".slidesjs-play.slidesjs-navigation").appendTo(".playpause_sec"); $(".slidesjs-stop.slidesjs-navigation").appendTo(".playpause_sec"); $(".slidesjs-pagination" ).append(""); $(".slidesjs-pagination" ).append(""); } catch(e){ } /* End: This code is added by iTalent as part of iTrack COMPL-455 */ $(".slidesjs-previous.slidesjs-navigation").attr('tabindex', '0'); $(".slidesjs-next.slidesjs-navigation").attr('tabindex', '0'); /* start: This code is added by iTalent as part of iTrack 1859082 */ $('.slidesjs-play.slidesjs-navigation').attr('id','playtitle'); $('.slidesjs-stop.slidesjs-navigation').attr('id','stoptitle'); $('.slidesjs-play.slidesjs-navigation').attr('role','tab'); $('.slidesjs-stop.slidesjs-navigation').attr('role','tab'); $('.slidesjs-play.slidesjs-navigation').attr('aria-describedby','tip1'); $('.slidesjs-stop.slidesjs-navigation').attr('aria-describedby','tip2'); /* End: This code is added by iTalent as part of iTrack 1859082 */ }); $(document).ready(function() { if($("#slides .item").length < 2 ) { /* Fixing Single Slide click issue (commented following code)*/ // $(".item").css("left","0px"); $(".item.slidesjs-slide").attr('style', 'left:0px !important'); $(".slidesjs-stop.slidesjs-navigation").trigger('click'); $(".slidesjs-previous").css("display", "none"); $(".slidesjs-next").css("display", "none"); } var items_length = $(".item.slidesjs-slide").length; $(".slidesjs-pagination-item > button").attr("aria-setsize",items_length); $(".slidesjs-next, .slidesjs-pagination-item button").attr("tabindex","-1"); $(".slidesjs-pagination-item button").attr("role", "tab"); $(".slidesjs-previous").attr("tabindex","-1"); $(".slidesjs-next").attr("aria-hidden","true"); $(".slidesjs-previous").attr("aria-hidden","true"); $(".slidesjs-next").attr("aria-label","Next"); $(".slidesjs-previous").attr("aria-label","Previous"); //$(".slidesjs-stop.slidesjs-navigation").attr("role","button"); //$(".slidesjs-play.slidesjs-navigation").attr("role","button"); $(".slidesjs-pagination").attr("role","tablist").attr("aria-busy","true"); $("li.slidesjs-pagination-item").attr("role","list"); $(".item.slidesjs-slide").attr("tabindex","-1"); $(".item.slidesjs-slide").attr("aria-label","item"); /*$(".slidesjs-stop.slidesjs-navigation").on('click', function() { var itemNumber = parseInt($('.slidesjs-pagination-item > a.active').attr('data-slidesjs-item')); $($('.item.slidesjs-slide')[itemNumber]).find('.c-call-to-action').attr('tabindex', '0'); });*/ $(".slidesjs-stop.slidesjs-navigation, .slidesjs-pagination-item > button").on('click keydown', function() { $.each($('.item.slidesjs-slide'),function(i,el){ $(el).find('.c-call-to-action').attr('tabindex', '-1'); }); var itemNumber = parseInt($('.slidesjs-pagination-item > button.active').attr('data-slidesjs-item')); $($('.item.slidesjs-slide')[itemNumber]).find('.c-call-to-action').attr('tabindex', '0'); }); $(".slidesjs-play.slidesjs-navigation").on('click', function() { $.each($('.item.slidesjs-slide'),function(i,el){ $(el).find('.c-call-to-action').attr('tabindex', '-1'); }); }); $(".slidesjs-pagination-item button").keyup(function(e){ var keyCode = e.keyCode || e.which; if (keyCode == 9) { e.preventDefault(); $(".slidesjs-stop.slidesjs-navigation").trigger('click').blur(); $("button.active").focus(); } }); $(".slidesjs-play").on("click",function (event) { if (event.handleObj.type === "click") { $(".slidesjs-stop").focus(); } else if(event.handleObj.type === "keydown"){ if (event.which === 13 && $(event.target).hasClass("slidesjs-play")) { $(".slidesjs-stop").focus(); } } }); $(".slidesjs-stop").on("click",function (event) { if (event.handleObj.type === "click") { $(".slidesjs-play").focus(); } else if(event.handleObj.type === "keydown"){ if (event.which === 13 && $(event.target).hasClass("slidesjs-stop")) { $(".slidesjs-play").focus(); } } }); $(".slidesjs-pagination-item").keydown(function(e){ switch (e.which){ case 37: //left arrow key $(".slidesjs-previous.slidesjs-navigation").trigger('click'); e.preventDefault(); break; case 39: //right arrow key $(".slidesjs-next.slidesjs-navigation").trigger('click'); e.preventDefault(); break; default: return; } $(".slidesjs-pagination-item button.active").focus(); }); }); // Start This code is added by iTalent as part of iTrack 1859082 $(document).ready(function(){ $("#tip1").attr("aria-hidden","true").addClass("hidden"); $("#tip2").attr("aria-hidden","true").addClass("hidden"); $(".slidesjs-stop.slidesjs-navigation, .slidesjs-play.slidesjs-navigation").attr('title', ''); $("a#playtitle").focus(function(){ $("#tip1").attr("aria-hidden","false").removeClass("hidden"); }); $("a#playtitle").mouseover(function(){ $("#tip1").attr("aria-hidden","false").removeClass("hidden"); }); $("a#playtitle").blur(function(){ $("#tip1").attr("aria-hidden","true").addClass("hidden"); }); $("a#playtitle").mouseleave(function(){ $("#tip1").attr("aria-hidden","true").addClass("hidden"); }); $("a#play").keydown(function(ev){ if (ev.which ==27) { $("#tip1").attr("aria-hidden","true").addClass("hidden"); ev.preventDefault(); return false; } }); $("a#stoptitle").focus(function(){ $("#tip2").attr("aria-hidden","false").removeClass("hidden"); }); $("a#stoptitle").mouseover(function(){ $("#tip2").attr("aria-hidden","false").removeClass("hidden"); }); $("a#stoptitle").blur(function(){ $("#tip2").attr("aria-hidden","true").addClass("hidden"); }); $("a#stoptitle").mouseleave(function(){ $("#tip2").attr("aria-hidden","true").addClass("hidden"); }); $("a#stoptitle").keydown(function(ev){ if (ev.which ==27) { $("#tip2").attr("aria-hidden","true").addClass("hidden"); ev.preventDefault(); return false; } }); }); // End This code is added by iTalent as part of iTrack 1859082
Top Solution Authors